AEHF 1 search elements

From: Ted Molczan (ssl3molcz@rogers.com)
Date: Sat Aug 14 2010 - 02:53:45 UTC

  • Next message: Greg Roberts: "Re: Admin: policy for reporting high resolution ground-basedimageryofEarth satellites"

    AEHF 1, the first of the Milstar replacements, is scheduled for launch from CCAFS, aboard an Atlas
    5-531, on 2010 Aug 14, between 11:07 UTC and 13:06 UTC:
    
    http://www.spaceflightnow.com/atlas/av019/status.html
    
    Here are approximate SECO 2 elements based on launch at 11:07 UTC:
    
    1 70004U          10226.48241898  .00000000  00000-0  00000-0 0    09
    2 70004  27.0000 310.5500 7303750 180.0000   2.0000  2.28263800    03
    
    There will be a burn by the payload`s liquid propellant motor, followed by 105 days of firing by the
    hall current thruster electric propulsion system, to reach a synchronous orbit, inclined about 5
    deg. It will be checked out near 90 W, before being moved to its operational location, which to my
    knowledge has not been announced.
    
    http://spaceflightnow.com/atlas/av019/100805move.html
    
    Ted Molczan
    
    _______________________________________________
    Seesat-l mailing list
    http://mailman.satobs.org/mailman/listinfo/seesat-l
    



    This archive was generated by hypermail 2b29 : Sat Aug 14 2010 - 02:54:57 UTC