ISS orbit boost scheduled for Sept 6.

From: Kevin Fetter via Seesat-l <seesat-l_at_satobs.org>
Date: Thu, 30 Aug 2018 16:03:21 +0000 (UTC)
Maneuvers contained within the current ephemeris are as follows:
 
 
   IMPULSIVE TIG (GMT)   M50 DVx(FPS)      LVLH DVx(FPS)      DVmag(FPS) 
   IMPULSIVE TIG (MET)   M50 DVy(FPS)      LVLH DVy(FPS)      Invar Sph HA
   DT                    M50 DVz(FPS)      LVLH DVz(FPS)      Invar Sph HP 
   ------------------------------------------------------------------------
  
   249/00:35:06.532           0.6               0.7              0.7    
   N/A                       -0.2              -0.1              223.0  
   000/00:00:13.064           0.2              -0.0              213.7  
   
  TWO LINE MEAN ELEMENT SET  
    ISS
    1 25544U 98067A   18243.95744434  .00016717  00000-0  10270-3 0  9038
    2 25544  51.6382   1.1091 0005510 112.8738 247.2997 15.53911187 10293
  
    ISS
    1 25544U 98067A   18244.92210856  .00016717  00000-0  10270-3 0  9043
    2 25544  51.6385 356.3020 0005487 116.1412 244.0305 15.53898391 10448
_______________________________________________
Seesat-l mailing list
http://mailman.satobs.org/mailman/listinfo/seesat-l
Received on Thu Aug 30 2018 - 11:04:12 UTC

This archive was generated by hypermail 2.3.0 : Thu Aug 30 2018 - 16:04:12 UTC