ISS orbit boost, to be done twice on Aug 14

From: Kevin Fetter via Seesat-l <seesat-l_at_satobs.org>
Date: Sat, 3 Aug 2019 22:50:45 -0400
They plan, to raise the orbit twice on Aug 14, first time I can remember
them doing this, no idea of the reason this time.

https://spaceflight.nasa.gov/realdata/sightings/SSapplications/Post/JavaSSOP/orbit/ISS/SVPOST.html


 Maneuvers contained within the current ephemeris are as follows:



   IMPULSIVE TIG (GMT)   M50 DVx(FPS)      LVLH DVx(FPS)      DVmag(FPS)
   IMPULSIVE TIG (MET)   M50 DVy(FPS)      LVLH DVy(FPS)      Invar Sph HA
   DT                    M50 DVz(FPS)      LVLH DVz(FPS)      Invar Sph HP
   ------------------------------------------------------------------------


   227/05:42:47.315           0.3               1.8              1.8
   N/A                        1.7               0.0              223.7
   000/00:09:34.629           0.4              -0.0              222.9

   227/08:44:47.258           0.6               1.8              1.8
   N/A                        1.7              -0.0              224.0
   000/00:09:34.515           0.1              -0.0              223.6
_______________________________________________
Seesat-l mailing list
http://mailman.satobs.org/mailman/listinfo/seesat-l
Received on Sat Aug 03 2019 - 21:51:46 UTC

This archive was generated by hypermail 2.3.0 : Sun Aug 04 2019 - 02:51:46 UTC