Below are the predicted element sets required after the undocking, which took place this morning. Assuming that the separation burn and two orbit adjustment burns go as planned, after 14:30 UTC, the shuttle's orbit will be as shown below. There are no additional shuttle manoeuvres scheduled before deorbit on Monday. Mir has not manoeuvred. Mir Complex post undocking 1 16609U 86017A 95322.45642709 .00003885 00000-0 46559-4 0 9179 2 16609 51.6410 104.9926 0002556 336.7720 23.3319 15.58152580557006 STS 74 after OA1 and OA2 burns 1 23714U 95061A 95322.64808599 .00019322 00000-0 20677-3 0 9192 2 23714 51.6450 104.0230 0009137 266.4267 93.5852 15.75497495 977 These elements were taken from the shuttle web page: http://shuttle.nasa.gov Ted Molczan