I believe there's a "box" piece in the Oct. 16 issue of "Aviation Week & Space Technology" (aka "Aviation Leak & Space Mythology") alluding to the budget crunch problem with the Soyuz booster. The extension of the EuroMir mission is an unexopected benefit of the fiscal situation. TTFN Geoff